From planning to installation closeout, one team on site.

A structured field process, from site verification and mobilization through installation, measurement and closeout.

Every project follows the same core sequence, adapted to the system, site conditions and client requirements. The focus remains the same: safe execution, accurate installation and documented handover.

  1. 01

    Planning

    Drawings, site survey and installation sequence. We verify the slab and existing site conditions before layout begins, identifying deviations that may affect alignment, plumb or required tolerances.

  2. 02

    Mobilization

    Crews, supervision, equipment and site logistics are coordinated before installation starts, including access, lifting equipment, material flow and project-specific safety requirements.

  3. 03

    Installation

    Supervised installation to project drawings and manufacturer specifications, with progressive measurement checks for alignment, plumb and required tolerances as the system is built.

  4. 04

    Closeout

    Final inspection, punch-list completion, measurement documentation and installation handover so the system can proceed to the next project phase, including commissioning when applicable.

Safety & quality

Planned for work at height. Supervised on every shift.

Automated systems are unforgiving: the structure has to be built safely and measured accurately, every shift, or the equipment will not run in it.

  • Work-at-height and fall-protection requirements
  • Dedicated on-site supervision and regular safety briefings
  • Site surveys and progressive measurement checks for alignment, plumb and required tolerances
  • Documentation of relevant site conditions, deviations and installation progress
  • Final inspection and punch-list closeout before handover

Training is matched to the task and the country: DC-3 training in Mexico for activities such as work at height, forklifts and tools, and OSHA 10- and 30-hour Outreach training in the United States for field personnel and supervision, plus equipment-specific operator credentials where a project requires them.